Steelwork Solutions | Design & Build | Fabrication & Supply
  • 07545 765 285

    email@tspmidlands.com

  • WH Davis Building,

    Mill Way, Mansfield,
    NG19 9BG

  • Office Hours

    Mon - Fri : 8 am - 5 pm

steel frame Archives - TSP Ltd.

Costa Coffee, Leeds

TSP were contracted to carry supply and install a new steel frame to form a Costa Coffee drive thru in Leeds Project Details Location: Leeds Scope: Supply, fabricate & install Tonnage: 20 tonnes (hot), 3 tonnes (cold) Finish: Painted / Galvanized Secondary Elements: Roof support steelwork, cold rolled purlins

Read More

300t Extension

TSP were contracted to carry out the steel frame extension to create multiple flats for the students of Leicester Project Details Location: Leicester Scope: Supply, fabricate & install Tonnage: 300 tonnes (hot) Finish: Painted Secondary Elements:

Read More

60t Podium deck

TSP were contracted to carry out the structural design for a podium transfer in wolverhampton Project Details Location: Wolverhampton Scope: Full frame design, supply, fabricate & install Supply & install of metal decking Tonnage: 60 tonnes (hot) Finish: Painted Secondary Elements: Flooring, Handrail, staircases, Metal decking

Read More

300t Portal Frame

TSP were contracted to supply new production facility in Sheffield Project Details Location: Sheffield Scope: Full frame design, supply, fabricate & install Tonnage: 15 tonnes (cold) / 300 tonnes (hot) Finish: Galvanized / Painted Secondary Elements: Flooring, Handrail, staircases, Metal decking

Read More

Co-op Refurbishment, Cumbria

TSP were contracted to supply new steelwork within an existing building along with a ‘back of house’ structure. Project Details Location: Cumbria Scope: Connection design, supply, fabricate & install Tonnage: 3 tonnes (cold) / 50 tonnes (hot) Finish: Galvanized / Painted Secondary Elements: Flooring, Handrail, ladders, Metal decking

Read More

Portal Frame and plant deck

TSP were contracted to supply new steelwork, cladding rails and plant deck steelwork for a food processing plant located in Lincolnshire.   Project Details Location: Lincolnshire Scope: Connection design, supply, fabricate & install Tonnage: 3 tonnes (cold) / 30 tonnes (hot) Hot Rolled: Yes Cold Rolled: Yes Finish: Galvanized Secondary Elements: Open Mesh Flooring, Handrail,

Read More

Twin Portal Frame

TSP were contracted to supply new steelwork, cladding rails and cladding for a new processing plant in Worcester.   Project Details Location: Worcestershire Scope: Connection design, supply, fabricate & install Tonnage: 12 tonnes (cold) / 50 tonnes (hot) Hot Rolled: Yes Cold Rolled: Yes Finish: Pre-Galvanized & Primer Finish Secondary Elements: Doors, mansafe system

Read More

Galvanized Loading dock

TSP were contracted to supply a new loading dock platform complete with handrail and gates for a major supermarket store.   Project Details Location: Nottinghamshire Scope: Connection design, supply, fabricate & install Tonnage: Approx 3.5 tonnes Hot Rolled: Yes Cold Rolled: No Finish: Galvanized Secondary Elements: Handrail, gates

Read More

Co-op, Chesterfield

TSP we contracted to supply new internal and external steelwork as part of a refurbishment project. It consisted of internal propping systems, new free standing extension and galvanized loading dock.   Project Details Location: Nottinghamshire Scope: Connection design, supply, fabricate & install Tonnage: Approx 12 tonnes Hot Rolled: Yes Cold Rolled: Yes Finish: Primer finish,

Read More

Branston Potatoes, Lincoln

  Project Details Location: Nottinghamshire Scope: Full structural design, supply & installation of independent frame Tonnage: Approx 12 tonnes Hot Rolled: Yes Cold Rolled: Yes Finish: Primer finish, galvanized cladding system Secondary Elements: none

Read More