Site Work Archives - TSP Ltd.
Dunkin Donuts, Mansfield
TSP Ltd were contracted to carry out the supply and install a new steel frame to form a Costa Coffee drive thru in Leeds Project Details Location: Mansfield Scope: Supply, fabricate & install Tonnage: 14 tonnes (hot), 3 tonnes (cold) Finish: Painted / Galvanized Secondary Elements: Roof support steelwork, cold rolled purlins
Read MoreThe Big Shed, Nottingham
TSP Ltd were contracted to carry out a full design and build package for a pub located in Nottingham. The scope was to create a new outdoor space to house sporting events Project Details Location: Nottingham Scope: Design, supply, fabricate & install Tonnage: 20 tonnes (hot), 3 tonnes (cold) Finish: Painted Secondary Elements:
Read MoreCosta Coffee, Leeds
TSP Ltd were contracted to carry out the supply and install a new steel frame to form a Costa Coffee drive thru in Leeds Project Details Location: Leeds Scope: Supply, fabricate & install Tonnage: 20 tonnes (hot), 3 tonnes (cold) Finish: Painted / Galvanized Secondary Elements: Roof support steelwork, cold rolled purlins
Read More300t Extension
TSP Ltd were contracted to carry out the steel frame extension to create multiple flats for the students of Leicester Project Details Location: Leicester Scope: Supply, fabricate & install Tonnage: 300 tonnes (hot) Finish: Painted Secondary Elements:
Read More60t Podium deck
TSP Ltd were contracted to carry out the structural design for a podium transfer in Wolverhampton Project Details Location: Wolverhampton Scope: Full frame design, supply, fabricate & install Supply & install of metal decking Tonnage: 60 tonnes (hot) Finish: Painted Secondary Elements: Flooring, Handrail, staircases, Metal decking
Read More300t Portal Frame
TSP Ltd were contracted to supply new production facility in Sheffield Project Details Location: Sheffield Scope: Full frame design, supply, fabricate & install Tonnage: 15 tonnes (cold) / 300 tonnes (hot) Finish: Galvanized / Painted Secondary Elements: Flooring, Handrail, staircases, Metal decking
Read MoreCo-op, Ambleside
TSP Ltd were contracted to supply new steelwork within an existing building along with a ‘back of house’ structure. Project Details Location: Ambleside, Cumbria Scope: Connection design, supply, fabricate & install Tonnage: 3 tonnes (cold) / 50 tonnes (hot) Finish: Galvanized / Painted Secondary Elements: Flooring, Handrail, ladders, Metal decking
Read MorePrinces Foods, Spalding
TSP Ltd were contracted to supply new steelwork, cladding rails and plant deck steelwork for a food processing plant located in Lincolnshire. Project Details Location: Lincolnshire Scope: Connection design, supply, fabricate & install Tonnage: 3 tonnes (cold) / 30 tonnes (hot) Hot Rolled: Yes Cold Rolled: Yes Finish: Galvanized Secondary Elements: Open Mesh Flooring,
Read MoreTwin Portal Frame
TSP Ltd were contracted to supply new steelwork, cladding rails and cladding for a new processing plant in Worcester. Project Details Location: Worcestershire Scope: Connection design, supply, fabricate & install Tonnage: 12 tonnes (cold) / 50 tonnes (hot) Hot Rolled: Yes Cold Rolled: Yes Finish: Pre-Galvanized & Primer Finish Secondary Elements: Doors, mansafe system
Read MoreCranswick Foods, Hull
TSP Ltd were contracted to dismantle an existing staircase to allow it to be re-used elsewhere on site at a later date. Project: Cranswick Foods Scope of work: Safe dismantle of existing staircase to be re-used elsewhere on site Location: Hull
Read More