Projects Archives - TSP Ltd.
60t Podium deck
TSP were contracted to carry out the structural design for a podium transfer in wolverhampton Project Details Location: Wolverhampton Scope: Full frame design, supply, fabricate & install Supply & install of metal decking Tonnage: 60 tonnes (hot) Finish: Painted Secondary Elements: Flooring, Handrail, staircases, Metal decking
Read More300t Portal Frame
TSP were contracted to supply new production facility in Sheffield Project Details Location: Sheffield Scope: Full frame design, supply, fabricate & install Tonnage: 15 tonnes (cold) / 300 tonnes (hot) Finish: Galvanized / Painted Secondary Elements: Flooring, Handrail, staircases, Metal decking
Read MoreCo-op Refurbishment, Cumbria
TSP were contracted to supply new steelwork within an existing building along with a ‘back of house’ structure. Project Details Location: Cumbria Scope: Connection design, supply, fabricate & install Tonnage: 3 tonnes (cold) / 50 tonnes (hot) Finish: Galvanized / Painted Secondary Elements: Flooring, Handrail, ladders, Metal decking
Read MorePortal Frame and plant deck
TSP were contracted to supply new steelwork, cladding rails and plant deck steelwork for a food processing plant located in Lincolnshire. Project Details Location: Lincolnshire Scope: Connection design, supply, fabricate & install Tonnage: 3 tonnes (cold) / 30 tonnes (hot) Hot Rolled: Yes Cold Rolled: Yes Finish: Galvanized Secondary Elements: Open Mesh Flooring, Handrail,
Read MoreTwin Portal Frame
TSP were contracted to supply new steelwork, cladding rails and cladding for a new processing plant in Worcester. Project Details Location: Worcestershire Scope: Connection design, supply, fabricate & install Tonnage: 12 tonnes (cold) / 50 tonnes (hot) Hot Rolled: Yes Cold Rolled: Yes Finish: Pre-Galvanized & Primer Finish Secondary Elements: Doors, mansafe system
Read MoreGalvanized Loading dock
TSP were contracted to supply a new loading dock platform complete with handrail and gates for a major supermarket store. Project Details Location: Nottinghamshire Scope: Connection design, supply, fabricate & install Tonnage: Approx 3.5 tonnes Hot Rolled: Yes Cold Rolled: No Finish: Galvanized Secondary Elements: Handrail, gates
Read MoreCo-op, Chesterfield
TSP we contracted to supply new internal and external steelwork as part of a refurbishment project. It consisted of internal propping systems, new free standing extension and galvanized loading dock. Project Details Location: Nottinghamshire Scope: Connection design, supply, fabricate & install Tonnage: Approx 12 tonnes Hot Rolled: Yes Cold Rolled: Yes Finish: Primer finish,
Read MoreCranswick Foods, Hull
TSP were contracted to dismantle an existing staircase to allow it to be re-used elsewhere on site at a later date. Project: Cranswick Foods Scope of work: Safe dismantle of existing staircase to be re-used elsewhere on site Location: Hull
Read MoreHeavy Duty Bollards
TSP have been appointed to supply & fabricate this cluster of UC sections which will be encased in concrete to form heavy duty bollards for a very busy distribution site.
Read MoreBranston Potatoes, Lincoln
Project Details Location: Nottinghamshire Scope: Full structural design, supply & installation of independent frame Tonnage: Approx 12 tonnes Hot Rolled: Yes Cold Rolled: Yes Finish: Primer finish, galvanized cladding system Secondary Elements: none
Read More