Steelwork Solutions | Design & Build | Fabrication & Supply
  • 07545 765 285

    email@tspmidlands.com

  • WH Davis Building,

    Mill Way, Mansfield,
    NG19 9BG

  • Office Hours

    Mon - Fri : 8 am - 5 pm

Design & Build Archives - TSP Ltd.

Dunkin Donuts, Mansfield

TSP Ltd were contracted to carry out the supply and install a new steel frame to form a Costa Coffee drive thru in Leeds Project Details Location: Mansfield Scope: Supply, fabricate & install Tonnage: 14 tonnes (hot), 3 tonnes (cold) Finish: Painted / Galvanized Secondary Elements: Roof support steelwork, cold rolled purlins

Read More

The Big Shed, Nottingham

TSP Ltd were contracted to carry out a full design and build package for a pub located in Nottingham. The scope was to create a new outdoor space to house sporting events Project Details Location: Nottingham Scope: Design, supply, fabricate & install Tonnage: 20 tonnes (hot), 3 tonnes (cold) Finish: Painted Secondary Elements:

Read More

Costa Coffee, Leeds

TSP Ltd were contracted to carry out the supply and install a new steel frame to form a Costa Coffee drive thru in Leeds Project Details Location: Leeds Scope: Supply, fabricate & install Tonnage: 20 tonnes (hot), 3 tonnes (cold) Finish: Painted / Galvanized Secondary Elements: Roof support steelwork, cold rolled purlins

Read More

300t Extension

TSP Ltd were contracted to carry out the steel frame extension to create multiple flats for the students of Leicester Project Details Location: Leicester Scope: Supply, fabricate & install Tonnage: 300 tonnes (hot) Finish: Painted Secondary Elements:

Read More

60t Podium deck

TSP Ltd were contracted to carry out the structural design for a podium transfer in Wolverhampton Project Details Location: Wolverhampton Scope: Full frame design, supply, fabricate & install Supply & install of metal decking Tonnage: 60 tonnes (hot) Finish: Painted Secondary Elements: Flooring, Handrail, staircases, Metal decking

Read More

Branston Potatoes, Lincoln

  Project Details Location: Nottinghamshire Scope: Full structural design, supply & installation of independent frame Tonnage: Approx 12 tonnes Hot Rolled: Yes Cold Rolled: Yes Finish: Primer finish, galvanized cladding system Secondary Elements: none

Read More