Cold Rolled Archives - TSP Ltd.
300t Portal Frame
TSP Ltd were contracted to supply new production facility in Sheffield Project Details Location: Sheffield Scope: Full frame design, supply, fabricate & install Tonnage: 15 tonnes (cold) / 300 tonnes (hot) Finish: Galvanized / Painted Secondary Elements: Flooring, Handrail, staircases, Metal decking
Read MoreCo-op, Ambleside
TSP Ltd were contracted to supply new steelwork within an existing building along with a ‘back of house’ structure. Project Details Location: Ambleside, Cumbria Scope: Connection design, supply, fabricate & install Tonnage: 3 tonnes (cold) / 50 tonnes (hot) Finish: Galvanized / Painted Secondary Elements: Flooring, Handrail, ladders, Metal decking
Read MorePrinces Foods, Spalding
TSP Ltd were contracted to supply new steelwork, cladding rails and plant deck steelwork for a food processing plant located in Lincolnshire. Project Details Location: Lincolnshire Scope: Connection design, supply, fabricate & install Tonnage: 3 tonnes (cold) / 30 tonnes (hot) Hot Rolled: Yes Cold Rolled: Yes Finish: Galvanized Secondary Elements: Open Mesh Flooring,
Read MoreTwin Portal Frame
TSP Ltd were contracted to supply new steelwork, cladding rails and cladding for a new processing plant in Worcester. Project Details Location: Worcestershire Scope: Connection design, supply, fabricate & install Tonnage: 12 tonnes (cold) / 50 tonnes (hot) Hot Rolled: Yes Cold Rolled: Yes Finish: Pre-Galvanized & Primer Finish Secondary Elements: Doors, mansafe system
Read MoreCo-op, Chesterfield
TSP Ltd were contracted to supply new internal and external steelwork as part of a refurbishment project. It consisted of internal propping systems, new free standing extension and galvanized loading dock. Project Details Location: Nottinghamshire Scope: Connection design, supply, fabricate & install Tonnage: Approx 12 tonnes Hot Rolled: Yes Cold Rolled: Yes Finish: Primer
Read MoreBranston Potatoes, Lincoln
Project Details Location: Nottinghamshire Scope: Full structural design, supply & installation of independent frame Tonnage: Approx 12 tonnes Hot Rolled: Yes Cold Rolled: Yes Finish: Primer finish, galvanized cladding system Secondary Elements: none
Read More