September 2022 - TSP Ltd.
posted by
0 Comment
Costa Coffee, Leeds
TSP Ltd were contracted to carry out the supply and install a new steel frame to form a Costa Coffee drive thru in Leeds Project Details Location: Leeds Scope: Supply, fabricate & install Tonnage: 20 tonnes (hot), 3 tonnes (cold) Finish: Painted / Galvanized Secondary Elements: Roof support steelwork, cold rolled purlins
Read More
posted by
0 Comment
300t Extension
TSP Ltd were contracted to carry out the steel frame extension to create multiple flats for the students of Leicester Project Details Location: Leicester Scope: Supply, fabricate & install Tonnage: 300 tonnes (hot) Finish: Painted Secondary Elements:
Read More