May 2020 - TSP Ltd.
posted by TSP Ltd
0 Comment
Co-op Refurbishment, Cumbria
TSP were contracted to supply new steelwork within an existing building along with a ‘back of house’ structure. Project Details Location: Cumbria Scope: Connection design, supply, fabricate & install Tonnage: 3 tonnes (cold) / 50 tonnes (hot) Finish: Galvanized / Painted Secondary Elements: Flooring, Handrail, ladders, Metal decking
Read More